Banner Image
Structural Engineering

Fusie Engineers Awarded by Cadeler for Boat Landing Design - Wind Mover

2025-08-01


What an amazing start of the summer for Fusie Engineers with another contract for our Equipment Design Department.


Wind Mover will be the second of two state-of-the-art M-class wind installation vessels in Cadeler’s newbuild portfolio, each engineered and equipped to install the next-generation offshore wind turbines currently being deployed across the globe.

The Wind Mover, currently under construction at Hanwha Ocean Shipyard in Korea, is expected to be delivered in Q4 2025.


Whereafter she will immediately start her voyage towards Europe. Prior to her first installation project, it is required to design, fabricate and install a boat landing for safe and efficient crew transfer during offshore operations.


Fusie Engineers has a proven track record of boat landing design for multiple contractors, including the design for Cadeler P-Class vessels last year 2024 (refer to the second picture).


We would like to thank Cadeler for choosing Fusie Engineers as their trusted partner for Equipment design.